As we daily track the progress of our new building, we are excited about each step! This week our construction team made progress on several different fronts - but all UNDER the foundation. Take a look at some of these pictures to get a glimpse at the progress that was made. They included:
Electrical service pipes to bring power to the building.
Water pipes for drainage (one corner will be under the HVAC room to collect and drain condensation).
You can see, quickly protruding from the base of the building, the elevator shaft in the center of the building. We have to be honest, we took a few videos of their amazing hydraulic scaffolding lift!
The last few pictures are of the footers for what will soon be the base of the tractor-trailer loading dock access.