Aerial Views - Snapshots of Progress
We invite you to check out our Album of Pictures that shows the last two weeks of progress at the Franklin site. The time and date stamp at the bottom of each picture provides an indication of how quickly the construction team is making headway on the building. This week they are pouring the final footers, the site is almost completely filled, and they will begin laying the masonry for the stairwells and the elevator shaft (which is the raised block you see at the center of the pictures).